Pipeline DN410, 2,000 meters, at the Yutian Pit Tailings Pond of the Zijinshan Gold-Copper Mine
+
  • Pipeline DN410, 2,000 meters, at the Yutian Pit Tailings Pond of the Zijinshan Gold-Copper Mine
Pipeline DN410, 2,000 meters, at the Yutian Pit Tailings Pond of the Zijinshan Gold-Copper Mine
+
  • Pipeline DN410, 2,000 meters, at the Yutian Pit Tailings Pond of the Zijinshan Gold-Copper Mine

Pipeline DN410, 2,000 meters, at the Yutian Pit Tailings Pond of the Zijinshan Gold-Copper Mine


Mineral type: copper ore. Daily processing capacity: 50,000 tonnes of raw ore. Commissioning date: December 2022. Operated for three years with no abnormalities.